Hubei xiongjiazui 220kV substation-jy-bqfk61850 digital optical fiber cooling control cabinet case
 
 
Project Profile:

Xiongjiazui 220kV substation is an intelligent transformation project, the second batch of pilot projects of State Grid Corporation of China, and one of the first batch of smart grid transformation pilot projects in Hubei Province in 2011. After completion, the equipment safety and intelligent operation level of the substation will be greatly improved.

Brief introduction of project products:

In January 2012, the first domestic digital optical fiber transformer cooling control cabinet independently developed and produced by our company was successfully debugged and put into operation in Hubei xiongjiazui 220kV substation, marking that our products have stepped into a new stage in the intelligent innovation of power grid.

Jy-bqfk61850 digital optical fiber cooling control cabinet used in the project is a new transformer cooling control cabinet for smart grid construction, which meets the application of new generation digital substation. Digital ied which meets IEC61850 substation communication network standard is adopted. Process flow is designed according to DL / t572-95 power transformer operation regulations. Abb, Siemens and Schneider low-voltage components are configured to ensure stable operation of products. Optical fiber Ethernet is used for data exchange of process layer ied equipment and bay layer.

 

 

 

 

 

 

 

 

 

The operation of the first type of QBK cooling cabinet in Heze Power Plant

Next: Shanghai Huxi 1000kV substation - jy-bqfk cooling control cabinet case